
HVAC Upgrades and Lighting Retrofits
Granbury ISD was faced with many challenges as it related to deferred maintenance and energy efficiency needs and sought the partnership of E3 to craft a plan and financial strategy to address those needs. After exhaustive collaboration and planning, a project was designed to accomplish the following:
- Over 200 HVAC units replaced older than 20 years
- T8 lighting retrofit and lighting control
- District-wide water conservation retrofit
- Field turf installation
E3 designed a program that replaced more than 200 HVAC units older than 20 years and completed a districtwide T8 lighting retrofit with controls.
To minimize disruption to summer classes and normal district workflows, construction was tightly coordinated. This included a notable single-day helicopter lift to place 160 HVAC units across rooftops, allowing summer school and facility cleaning to proceed on schedule. Actual energy savings exceeded expectations, delivering $323,362 in Year 1 ($41,500 over the guaranteed target).

Project Gallery





District-wide Water Conservation and Turf Upgrades
To address the district’s high water bills, E3 designed and performed a comprehensive water conservation retrofit, upgrading restroom plumbing and faucets across campuses. To deliver additional water savings and eliminate intensive maintenance requirements, E3 coordinated the installation of low-maintenance synthetic field turf on the varsity athletic fields.
Project Documentation

